Large pile construction is pivotal in creating the foundation for various structures, yet it faces specific challenges that can impede progress and affect overall project success. This blog explores common problems encountered during these operations and outlines effective strategies to overcome them, ensuring a smoother, more efficient construction process.

Decreasing Construction Efficiency

One of the primary concerns in large pile construction is the notable decrease in construction efficiency. This issue arises from several factors, including inadequate drilling equipment and improper planning.

Strategies for Improvement:

Choosing the Right drill bit: Selecting a  drill bit  tailored to the soil conditions can significantly enhance drilling efficiency.

Tailoring the Drilling Plan: Implementing a drilling plan that adapts to the capabilities of the drilling machinery and the nature of the soil can help maintain efficiency, especially through single-pass drilling in softer soils or adopting staged drilling in more challenging conditions.

Pile Hole Deviation

Pile hole deviation is another challenge, often resulting from differences in the diameters of drill heads and rods, shorter drill head heights, and uneven soil layers.

Correction Measures:

Using Stabilizers: Adding stabilizers to drill rods can help maintain the intended drilling direction.

Increasing Drill Head Height: Ensuring the drill head height is maximized can aid in maintaining drilling accuracy.

Staged Drilling Approach: A staged drilling process, starting with a smaller diameter and expanding, can mitigate deviation risks, especially in soils prone to shifting.

Frequent In-Hole Accidents

Accidents within the pile hole, such as broken drill rods, dropped drill heads, and difficulty in opening the drill bucket due to the heavy load, are common due to the large diameter and weight of the drill head.

Preventative Strategies:

Proper Usage and Maintenance: Adhering to the correct operational procedures for  drill rods  can prevent many of these issues.

Reinforcement Measures: Employing dual pins for connecting drill rods and heads and using steel ropes to secure the drill head can reduce the risk of in-hole accidents.

Safe Opening Techniques: Adopting safe practices for opening the drill bucket, either on the ground or through high-speed reverse rotation in the air, can alleviate soil removal challenges.

Conclusion

Addressing the challenges in large pile construction requires a multifaceted approach, focusing on equipment selection, procedural adjustments, and safety enhancements. By adopting these strategies, construction projects can achieve higher efficiency, accuracy, and safety, laying a solid foundation for future development.